11-07-2023 08:14 AM - edited 11-07-2023 10:41 PM
Hi Team,
I've noticed a minor discrepancy: there are two different default polling interval times present in two separate workspaces.
Fig1. shows default value as 30mins
Fig.2 shows default value as 5mins
Could you please make necessary correction?
Solved! Go to Solution.
11-07-2023 09:31 PM
Hi @shivakumara, I already saw this the other day when using a Trial-Workspace vs. a Production-Workspace. So, it looks like we are limiting the frequency for unpaid accounts.
Perhaps you check into that direction by starting to validate the plan in each workspace.
Cheers,
Chris
11-07-2023 10:30 PM
But problem with a plan is concept wise it gives a wrong information to the users? hence it is better to have one single information even though people go with trial or subscription model.
11-07-2023 04:17 PM
Interesting... never seen that before. Have you checked with Workato Support? They are quite responsive. Curious to hear the outcome.
11-07-2023 09:31 PM
Hi @shivakumara, I already saw this the other day when using a Trial-Workspace vs. a Production-Workspace. So, it looks like we are limiting the frequency for unpaid accounts.
Perhaps you check into that direction by starting to validate the plan in each workspace.
Cheers,
Chris
11-07-2023 10:30 PM
But problem with a plan is concept wise it gives a wrong information to the users? hence it is better to have one single information even though people go with trial or subscription model.
11-07-2023 10:36 PM
Hi @shivakumara, but technically the information shown to the user is correct, as the poll is really executed with the displayed interval. It would be wrong to show them a 5 minutes interval in a Trial-Workspace and in the background run it every 30 minutes instead.